The terminal operates on jetties 1, 2 and 4 of Sillamäe Port. Jetties 1 and 2 are suitable for tankers of up to 100,000 DWT, and jetty 4 for tankers of up to 30,000 DWT. Jetties 1 and 2 are operated exclusively by Alexela Sillamäe.
Location: |
Narva Bay, 25 km from the border of the European Union and the Russian Federation |
Operator: |
|
Depth of approach canal: |
16,5 m |
Sea level: |
no tides, sea level depends on wind direction and force |
Type of bottom: |
sand, gravel, mud |
Jetties 1 and 2
Depth: |
15,8 m |
Length of jetty: |
319 m |
Vessel |
|
Max length: |
250 m |
Max width: |
42 m |
Expected load / discharge rates: |
2 x 16-inch loader arm, 3000 m³/h for each arm |
2 x 8-inch hose, 300 m³/h for each hose |
|
Pipe connection with the terminal: |
2 x 600 mm with electric heating and thermal insulation |
2 x 200 mm with electric heating and thermal insulation |
Jetty 4
Depth: |
12 m |
Length of jetty: |
200 m |
Vessel |
|
Max length: |
170 m |
Expected load / discharge rates: |
2 x 8-inch hose, 300 m³/h for each hose |
Pipe connection with the terminal: |
2 x 200 mm with electric heating and thermal insulation |