The terminal is linked to the Estonian Railway via the Vaivara station; it also has access to the rail tracks of the rail station of Sillamäe Port.

The railway tank wagon handling facilities allow the simultaneous unloading of 2×44, 2×18 and 2×20 railway tank wagons. We use both upper and lower unloading devices. Closed circulation based on thermal oil is used for heating fuels. The unloading process of a railway wagon can take up to 24 hours in wintertime.